Print Cost Lab

Tool 06 / Multicolor waste

See what every color change adds to the part.

Separate model filament from purge, flush, and prime-tower material. Calculate the waste share, added machine time, cost per finished part, and the value of batching identical models.

01

Enter your multicolor plate

Separate model, flush, and prime-tower grams from the slicer preview.

Inputs are planning examples. Replace them with the final plate statistics from Bambu Studio or your slicer.

Waste belongs in the quote.

Separate product material from process waste

Model grams become the saleable parts. Flush and purge material, prime towers, and other transition structures enable color changes but do not become products. Both leave the spool and must be paid for.

Include additional machine time

Retractions, loading, unloading, purging, wiping, and repeated travel can add hours beyond a single-color version. Enter only the additional time caused by the multicolor workflow.

Batching can lower overhead per part

Several identical models can share many of the same color transitions. When the slicer reports one plate-level waste value, the calculator divides that overhead across all finished parts.

Transparent example assumptions

One 85 g model with 95 g of flushing and a 25 g tower sends 120 g to process waste. Waste is 58.5% of the plate's filament before support or failed-print allowance. These are editable example inputs, not a measured P1S or AMS result.

Process waste = support + flush + prime towerExpected accepted cost / part = (all filament cost + full machine time) ÷ (1 − failure rate) ÷ partsMinimum price reference = expected accepted cost ÷ (1 − target margin)

Use the slicer's plate summary after slicing the final color sequence. Generic purge assumptions can be very different from the actual printer, filament colors, flushing volumes, and model layout.

Single-color premium uses the same model, support, and failure-rate assumptions, then removes flush and prime-tower material and substitutes the single-color reference time. Updated .

Carry this result into the complete quote.

Connect color-change waste to P1S ownership, AMS storage overhead, accepted-job cost, and selling price without counting the same expense twice.

Open the cost hub →

Multicolor waste calculator FAQ

Should purge and tower grams be combined?

Enter them separately when the slicer provides both values. The calculator combines them for total waste while preserving a clear input record.

Why can adding copies reduce cost per part?

Many color transitions happen per layer or per plate, not once per model. Additional copies can share the same purge events, although the final slicer summary remains authoritative.

Does purge material always go in the trash?

Some workflows purge into infill or another object. Count only the grams that do not become a useful product, and verify surface or color requirements before reducing flush volumes.

Is this calculator limited to one printer brand?

No. It works with any slicer that reports model material, transition waste, tower material, and print-time differences.

Use the final slicer summary—not a universal AMS preset.

Bambu Studio's official project and issue history document separate flush and prime-tower reporting and show why values can change with software settings. This calculator does not claim measured output from the operator's P1S+AMS; its defaults are labeled planning examples.

Bambu Lab — official Bambu Studio repository · Bambu Studio issue #460 — flush and prime-tower reporting discussion · 3D Print Cost Lab methodology

See the source of each input, the formula, and the limit of the result.

Your slicer, invoices, energy tariff, and job records are the preferred inputs. Manufacturer documents support settings and specifications. Example defaults are editable assumptions that demonstrate the model—not measured results.

Preferred input
Your job records
Verification
Visible formula + unit checks
Defaults
Editable example assumptions
Output use
Planning comparison