Print Cost Lab

Expansion economics

Second 3D Printer Payback Calculator

Before you buy another printer, subtract the orders your current printers can handle. Then test whether the additional sales could pay back that one purchase.

Model the additional printer

MODELED EXAMPLE · figures are editable USD assumptions, not market averages. Review the example fee and maintenance in advanced settings.

Use the price you expect to pay for just the additional machine.
Include one-off setup, wiring or commissioning costs.
Enter additional units you could actually sell, before using up current spare capacity.
Count only compatible, saleable output after existing orders.
Use saleable output from the capacity calculator, unless you select before-failure output below.
Use what you charge before the percentage selling fee below.
Include material, electricity, paid labor and expected waste. Exclude depreciation, fees and monthly costs entered elsewhere.
Include costs that remain even at zero sales. Exclude maintenance if entered separately.
Advanced: fees, yield and target payback
For example, a dedicated build plate or spares bought at installation.
Apply one combined percentage to revenue. Do not include it again in unit cost.
Enter expected additional cash maintenance, unless already included in fixed costs.
Enter 0 to omit the target. The calculator still estimates any attainable payback.
Do not deduct failures again from saleable capacity.

What if only half the orders arrive?

Only demand changes. Current spare capacity is used first and new sales are capped by saleable output. These are modeled outcomes, not operating results.

CaseOrders/moNew sales/moCash profit/moPayback
Conservative 50%420-$60.00No payback
Base 100%8540$132.407.55 mo
Optimistic 150%12760$228.604.37 mo

Count the sales you cannot make today.

Suppose you can sell 85 units per month beyond today's orders. Your printers have room for 45 more, so only 40 could be created by the purchase, even if the new printer could make 60. At $17 each, $11 cash cost per saleable unit and a 7% selling fee, each new sale contributes $4.81 toward fixed costs and payback.

Forty sales contribute $192.40. Subtract $60 in monthly fixed costs and maintenance to get $132.40 in extra cash profit. On a $1,000 initial purchase and setup, simple payback is about 7.55 months. If the 85-unit demand falls by half, existing spare capacity covers it and the new machine still incurs the modeled fixed costs.

Use this when the product and order mix are comparable

This is an example, not recorded income or a price survey. The model assumes steady monthly demand, price, yield and cash cost for one job family. It does not model inventory, taxes, financing, discounting, resale, ramp-up, or a week-by-week production schedule.

Simple incremental cash payback

upfront = purchase + installation + other one-off costsnew sales = min(max(extra orders − current spare units, 0), new saleable output)contribution per unit = price × (1 − fee rate) − cash cost per saleable unitfixed cash cost = extra monthly fixed costs + maintenance not already includedmonthly cash profit = new sales × contribution per unit − fixed cash costpayback months = upfront ÷ monthly cash profit, if profit > 0total units to recoup = round up(upfront ÷ (monthly cash profit ÷ new sales))target units/month = round up((upfront ÷ target months + fixed cash cost) ÷ contribution per unit)cumulative cash flow at N months = N × monthly cash profit − upfront

If you enter gross capacity, saleable output is gross output × (1 − loss rate). Fractional output is rounded down. Fees and maintenance are counted once. The target calculation requires positive unit contribution; the target can be infeasible with the current demand or equipment.

Check spare hours before equipment ROI.

From the capacity tool, use compatible spare units for the existing fleet and effective monthly units for one new printer. Use your profit-per-hour breakdown to find incremental cash costs; don't copy the hourly profit or the full machine rate as a unit cost.

What changes the expansion decision?

Should I buy another 3D printer if my first one has idle time?

Not to fill the orders your current printer can already handle. Count only repeatable orders above the compatible spare capacity of the equipment you own.

Do I include machine depreciation in the unit cost?

No. This is a cash-payback model. The extra printer purchase is counted upfront, so remove that same depreciation or replacement reserve from any hourly rate you use to build the unit cost.

Why can there be cash profit but a missed payback target?

Positive monthly cash profit makes payback possible. A deadline also requires enough profit per month. Compare the monthly sales needed for the target with both your unserved demand and the new printer's saleable output.

How do I account for failed prints?

If you only have before-failure output, apply a loss rate to that capacity. If you have already estimated saleable output, do not apply it again. Enter cash costs per saleable unit including the expected cost of failed attempts.

See the source of each input, the formula, and the limit of the result.

Your slicer, invoices, energy tariff, and job records are the preferred inputs. Manufacturer documents support settings and specifications. Example defaults are editable assumptions that demonstrate the model—not measured results.

Preferred input
Your job records
Verification
Visible formula + unit checks
Defaults
Editable example assumptions
Output use
Planning comparison